Commercial Electrical
Backup Power & UPS in Atlanta, GA
Keep critical operations running through outages with right-sized standby generators and UPS systems — installed, commissioned, and supported.
What's included
- ✓ Load study & sizing
- ✓ Generator + ATS install
- ✓ Rack UPS install & maintenance
- ✓ Annual PM contracts
We pull your permit & coordinate the inspection
Every job that requires it gets a permit pulled under our Georgia Electrical Contractor license #EN219136. We coordinate the county inspector (Fulton, Cobb, DeKalb, Gwinnett, Cherokee, Forsyth, Henry and surrounding counties) and stay onsite until the work is signed off — so your project is documented, insurable, and 100% code-compliant.
- ✓ Permit application & fees handled
- ✓ NEC 2020 + Georgia amendments
- ✓ County inspector scheduling
- ✓ Sign-off documentation for your records
Frequently asked questions
How do I know if my office needs a standby generator? +
Ask: how many hours can we lose power before losing revenue? If you can't afford downtime (server outages, refrigeration, HVAC crash), a generator makes sense. For most offices, a mid-sized generator plus UPS system protects critical loads. We do a free risk assessment.
What's the difference between a standby generator and UPS? +
A UPS (uninterruptible power supply) works instantly — milliseconds — for brief outages or to allow graceful shutdown. A standby generator kicks in within 5–10 seconds (good for HVAC/refrigeration but not instant). Both together: UPS buys time for the generator to start.
How much does a commercial backup power system cost? +
A 20 kW standby generator: $4,000–$8,000 installed. A 5 kVA UPS system: $3,000–$6,000. Combined install with transfer switch and load study: $10,000–$15,000. Varies by facility size and critical loads. We quote after a walk-through.