Commercial Electrical
Tenant Build-Out Electrical in Atlanta, GA
Coordinate with GCs and landlords to deliver complete electrical scope: feeders, panels, lighting, power, low-voltage rough-ins, and final inspection.
What's included
- ✓ Plan review & design-assist
- ✓ Feeders, panels & branch circuits
- ✓ Lighting & controls
- ✓ Permit & inspection management
Permit and inspection review
Permit and inspection requirements depend on project scope and jurisdiction. We confirm applicable requirements during review before scheduling the next step.
- ✓ Permit needs reviewed by scope
- ✓ Applicable code requirements reviewed
- ✓ Inspection needs confirmed by jurisdiction
- ✓ Documentation needs confirmed during review
Frequently asked questions
How long does tenant finish-out electrical take? +
Typical TI projects: 2–4 weeks for rough-in (feeders, panels, branch circuits), then 1–2 weeks for trim-out (fixtures, switches, final testing). Timeline depends on building coordination, permit turnaround, and inspections. We work around GC schedules and keep it on track.
What's included in a commercial rough-in electrical scope? +
Feeders from main panel, tenant sub-panels, branch circuit conduit and wire, outlet/switch/fixture boxes, lighting, receptacles, and any special circuits (dedicated equipment, floor boxes, data rough-in). Permit and one rough inspection included.
Can you work with my architect and GC on the electrical design? +
Absolutely. We do design-assist from day one — review architectural plans, flag load challenges, suggest efficient routing, and coordinate with mechanical and plumbing. Our input catches issues early and saves money during construction.
Need tenant build-out electrical?
Based in Duluth and serving Metro Atlanta. Estimate options depend on project details.