JA IT Electric logo JA IT ELECTRIC

Industrial Electrical

Machine Wiring & Relocation in Atlanta, GA

Relocating equipment? We disconnect, label, move, reconnect, and re-energize machinery with minimum downtime, including any feeder or panel changes.

Machine Wiring & Relocation service photo

What's included

  • Disconnection & labeling
  • Move support
  • Reconnection & checkout
  • As-built drawings

Permit and inspection review

Permit and inspection requirements depend on project scope and jurisdiction. We confirm applicable requirements during review before scheduling the next step.

  • Permit needs reviewed by scope
  • Applicable code requirements reviewed
  • Inspection needs confirmed by jurisdiction
  • Documentation needs confirmed during review

Frequently asked questions

What do you do to prevent downtime when relocating heavy machinery? +

We de-energize and label every wire, disconnect feeder and control circuits carefully, support the machine move, then reconnect, test, and re-energize. Documentation is critical — we take photos before disconnect and create an as-built wiring diagram. Most moves: 1–2 days.

Do moved machines require new electrical certification? +

Not always, but we do a full electrical checkout: continuity, grounding, insulation resistance, and operational testing. If the move exposed damage or the feeder was stretched, we repair it. We provide a signed report for your insurance and maintenance records.

Can you help us relocate equipment without our integrator present? +

We handle all electrical aspects — disconnection, labeling, reconnection, and basic control testing. For PLC/automation retuning, you'll want your integrator for software verification. We provide wiring documentation so they can pick up where we left off.

Need machine wiring & relocation?

Based in Duluth and serving Metro Atlanta. Estimate options depend on project details.