JA IT Electric logo

Industrial Electrical

PLC Panel Installation in Atlanta, GA

Install PLC-based control panels, wire field devices, and commission new or relocated production lines. We coordinate with your integrator or program ourselves.

PLC Panel Installation service photo

What's included

  • Panel mount & power-up
  • Field device wiring
  • I/O point-to-point check
  • Commissioning support

We pull your permit & coordinate the inspection

Every job that requires it gets a permit pulled under our Georgia Electrical Contractor license #EN219136. We coordinate the county inspector (Fulton, Cobb, DeKalb, Gwinnett, Cherokee, Forsyth, Henry and surrounding counties) and stay onsite until the work is signed off — so your project is documented, insurable, and 100% code-compliant.

  • Permit application & fees handled
  • NEC 2020 + Georgia amendments
  • County inspector scheduling
  • Sign-off documentation for your records

Frequently asked questions

Can you install a PLC panel if an integrator designed it? +

Absolutely. We mount, wire field devices, and commission — you provide the panel and control narrative. We verify I/O point-by-point, check grounding and power supply, and work with your integrator for software testing and hand-off.

How long does PLC panel commissioning usually take? +

Hardware install: 1–2 days. Field device wiring & termination: 2–5 days depending on I/O count. Functional testing with integrator: 1–3 days. Total project: 1–3 weeks depending on complexity and your production schedule.

What's included in your electrical punch list after PLC commissioning? +

We provide as-built panel drawings, I/O labeling, terminal designations, and a commissioning report. Safety items (e-stops, emergency buttons, fence gates) are tested and logged. We leave you with documentation for future maintenance or upgrades.

Need plc panel installation?

Licensed, insured, and local — free written estimates in metro Atlanta.